Home / Our Datacentres
Home / Our Datacentres
Our Maidenhead data centre is situated on a purpose built site near the centre of the town.
The Maidenhead data centre provides a total capacity of 1300m² (14,000ft²) of high quality, resilient and secure space across 4 data halls.
24 hour Manned Security, CCTV & Intruder Alarms
24 hour on site Network Operations Centre (NOC)
2 x 1MW Generators
0.75 kW/m² power density
N+1 Air Conditioning Systems
Dual zone fire detection
Up to 63A MCCB's within PDUs
Dark Fibre Capability & Diverse Fibre Entry
Carrier Neutral
2 x 500 kVA UPS (N+1)
Controlled Environment - room temperature 24°C +/- 2°C
0.75kW/m² cooling density
12kN/m² raised floor system - 480mm void
Mirrored Switchgear
Our Manchester data centre is located just south of Manchester's city centre.
The data centre offers a net capacity of 278m²(3,000 ft²)of high quality, resilient and secure space.
24 hour Manned Security, CCTV & Intruder Alarms
24 hour on site Network Operations Centre (NOC)
2 x 2MW Generators
0.75 kW/m² power density
N+1 Air Conditioning Systems
VESDA fire detection & FM200 suppression system
Up to 63A MCCB's within PDUs
Dark Fibre Capability & Diverse Fibre Entry
Carrier Neutral
2 x 380 kVA UPS (N+1)
Controlled Environment - room temperature 21°C +/- 2°C
0.75kW/m² cooling density
12kN/m² raised floor system - 480mm void
Mirrored Switchgear
Our Nottingham data centre is situated to the west of the City.
The data centre offers a single data hall providing a net capacity of 410 m² (4,445 ft²) of high quality, resilient and secure space.
24 hour Manned Security, CCTV & Intruder Alarms
24 hour Network Monitoring
800 Kva Generator
N+1 Air Conditioning Systems
Dual zone fire detection & suppression system
Up to 63A MCCB's within PDUs
Dark Fibre Capability & Diverse Fibre Entry
Carrier Neutral
2 x 500 kVA UPS (N+1)
Controlled Environment - room temperature 24°C +/- 2°C
0.75kW/m² cooling density
12kN/m² raised floor system - 600mm void
Our US servers are located purpose built 25k square foot facility in Los Angles, USA.
Electronic access control and physical security
Hand Readers provided by ADT Security
24 hour on site Network Operations Centre (NOC)
Category 4 storm resistant
20GE - Diverse Dark Fiber to Miami NAP of Americas
1 X 500KW Caterpillar Diesel Generator
1 X 1250KW Katolight Diesel Generator
1 X 500KVA Powerware 9315 UPS
1 X 480KVA Powerware 9390 UPS in a parallel N+1 configuration
5 X Battery Strings (providing 15 minutes of runtime at full load)
2,700 Gallons of fuel capacity for generators